SSOT / GOVERNING REFERENCEDOCUMENT 18 OF 28

Implementation program and dependency-ordered milestones

Status: authoritative roadmap; milestones are not claims of completion.

Progressive delivery order

Gate Deliverable Completion evidence
D0 Canon, typed schemas, no-effects planner Negative policy tests; deterministic plans; no network/effects
D1 Authenticated PHP cockpit, owner state, durable SQLite queue/outbox Session/CSRF/ACL tests; crash replay; transactional idempotency
D2 One fully bounded CPU micro-harness and oracle No code injection; deterministic accepted result; retry/cancel
D3 One macro DAG, evidence ledger, exact capture and template candidate generator Byte-for-byte fixtures; 3 variants; counterexamples; scoped capture consent
D4 Isolated static rule build/sign/review/canary/rollback Signed immutable release and failing rollback simulation pass
D5 Mock provider and independent guardian Provision ambiguity, orphan, late billing and stop failure simulations
D6 First real paid adapter with account-level cap and explicit owner authorization Provider inventory and billing independently reconciled
D7 Qualified S2/M1/L0/U0 selective routing Verified per-node direct jumps, quote freshness and return to Small
D8 More robust fleet, storage/HA and optional multi-worker macros Load, cross-owner isolation, topological dependencies and data residency tests
D9 High-end Ultra topology integrations only when demanded by evidence Pinned benchmarks, true multi-GPU/fabric fit, restore and financial audit
D10 Customer-grade support, export/import, observability and accessibility External review, performance baselines, tested support and recovery policy

The system should be useful at D2/D3; do not postpone the entire product until U2 works. The highest rung is available in the architecture, not a standing infrastructure purchase.

Stop/go criteria

Never authorize paid workers before independent guardian and billing controls pass mock failure tests. Never promote a compiled recipe before a complete exact-capture evidence chain and golden/negative fixtures pass. Never claim customer-ready production without authenticated deployment, provider-specific runbooks, security review, operational metrics, backups and independent expense reconciliation.

Related

Acceptance gates · Status · Operations.